Yesterday we managed to get the block base built around 3 walls which looks spot on!
Today we went off early to the builders merchants to get a load of stuff and they had to deliver it in two loads and as you would expect, the materials I needed first were on the second delivery that didnt turn up until 4pm. Also the timber I ordered has to be delivered using a sling and the gap between the top of the hedge and the telephone cable was too short so they had to drop it off on the grass verge and I had to shift it by hand. Luckily, a neighbour of mine was driving past and stopped to give me a hand.