What a couple of days we have had, it has been miserable for the last couple of days - even had a thunder storm at 3am this morning but it brightened up not long after sunrise.
Today I completed the frame that contains the long window (2.4m long) to the lounge (on the right of the plan). I did have to ring my apprentice to wonder where she was because there would have been no way I could have lifted that whole frame into position on my own.
I also have the frame on the opposite side (with the French doors) 90% completed and erected.
I am officially goosed!!!
No comments:
Post a Comment